OGDC starts Bitrism East-1 production at 7.0 MMSCFD of gas
The well is also producing 200 barrels of condensate per day from the Basal Sands, with output expected to rise as flow stabilizes.

At a glance
- Bitrism East-1 is producing 7.0 MMSCFD of gas from the Basal Sands.
- Condensate production is 200 barrels per day.
- Production is expected to ramp up as well flow stabilizes.
- OGDC operates the licence with a 77.5% working interest.
Key facts
- Gas production
- 7.0 MMSCFD
- From the Basal Sands
- Condensate production
- 200 barrels per day
- From the Basal Sands
- OGDC working interest
- 77.5%
- Operator of the Bitrism Exploration Licence
Oil & Gas Development Company Limited OGDC brought the Bitrism East-1 exploratory well in District Khairpur, Sindh Province, into production, with output of 7.0 MMSCFD of gas and 200 barrels of condensate per day from the Basal Sands, according to a filing with the Pakistan Stock Exchange dated October 22, 2026.
The company said production is expected to be progressively ramped up as the well flow stabilizes. The announcement follows OGDC’s disclosure dated October 01, 2025, regarding a gas-condensate discovery at the exploratory well in the Lower Goru Formation.
OGDC said it used in-house resources to lay an approximately 28-kilometre, 8-inch flowline connecting the well to the Sinjhoro Plant for processing. The processed gas is being supplied to the SSGCL network.
OGDC operates the Bitrism Exploration Licence with a 77.5% working interest. Government Holdings (Private) Limited holds the remaining 22.5%.
OGOGDCPakistan Stock ExchangeStocks in this story
Sources
This story was produced by the Investify News Desk with automated tools and checked against the sources listed. Report an error: support@investify.pk. Editorial policy
More on OGDC
OGDCL inks deal with PINSTECH for lithium explorationBR• 29 Sept 2026Positive coverage
OGDC welcomes 2nd batch of female management trainee officersBR• 29 Sept 2026Neutral coverage
OGDC: Tax reversal powers record profitBR• 14 Sept 2026Positive coverage
OGDCL starts gas production from Lundali-1 well in SindhBR• 10 Sept 2026Positive coverage
OGDCL, MARI-backed Lundali-1 well starts gas production in SindhBR• 9 Sept 2026Positive coverage
OGDC, MARI bring Lundali-1 gas well onlineMettis• 9 Sept 2026Positive coverage
