CorporateQuick read

Textile giant Gul Ahmed approves LOI for two wind turbines

Business Recorder • • 1 min read

Textile giant Gul Ahmed approves LOI for two wind turbines

Gul Ahmed Textile Mills has approved a Letter of Intent for buying two wind turbines with a combined capacity of 15.75 MW, Business Recorder reported. The listed company disclosed the board’s decision in a filing to the stock exchange on Monday, following a resolution passed by circulation on November 14, 2026.

Each turbine is rated at 7.875 MW, and the equipment is to be procured from Ming Yang Renewable Energy (International) Company Limited through Windtek (Private) Limited. Gul Ahmed is a composite textile manufacturer that also operates a retail business, with more than 40 stores across Pakistan selling clothing, fashion and home accessories. The filing records approval of the LOI, rather than confirmation that the turbines have been delivered or commissioned.

At a glance

  • Gul Ahmed approved an LOI for two wind turbines with a total capacity of 15.75 MW.
  • The turbines will be sourced through Windtek from Ming Yang Renewable Energy.

Stocks in this story

Sectors:Textile Composite

Originally reported by Business Recorder

This page is Investify's own summary. The full report, with all details and context, is on the publisher's site.

Read the full story

Want the full article here?

Log in to read the full article in the Investify reader, in English or Urdu.

Investify summarizes Pakistan Stock Exchange news in its own words and links each story to its original publisher. We always credit the source so you can read the full report and verify the details before making financial decisions.

Built for PSX investors

Business news.Every filing, summarised.

Top stories from Pakistan's business press and key findings from every PSX announcement.

Investify announcement summary with key findings from a PSX filing
Investify app home screen with Pakistan business news and PSX filings