Saif Textile commissions 10MW solar plant
Mettis Global • • 1 min read

Saif Textile Mills Limited has brought a 10 megawatt solar power plant into operation at its manufacturing site in Gadoon Amazai, Khyber Pakhtunkhwa, according to Mettis Global. The project is part of a plan to lower energy expenses and make operations more efficient.
In a filing to the Pakistan Stock Exchange, the company confirmed that the installation is complete and the plant is running. The array is expected to reduce dependence on grid power and offer a buffer against higher electricity tariffs, with margin benefits anticipated over time.
The textile sector has faced sustained pressure from energy costs, and the company also links the plant to a lower carbon footprint and tighter long-term cost control. Pakistani firms more broadly are turning to solar as power tariffs stay elevated and supplies remain constrained.
At a glance
- Saif Textile's 10 megawatt solar plant is operational at its Gadoon Amazai facility.
- The company disclosed the commissioning to the Pakistan Stock Exchange.
- The project aims to reduce grid electricity reliance and energy costs.
Stocks in this story
Originally reported by Mettis Global
This page is Investify's own summary. The full report, with all details and context, is on the publisher's site.
Read the full storyWant the full article here?
Log in to read the full article in the Investify reader, in English or Urdu.
Investify summarizes Pakistan Stock Exchange news in its own words and links each story to its original publisher. We always credit the source so you can read the full report and verify the details before making financial decisions.
More on SAIF
PSX Closing Bell: A Hint of RetreatMettis• 25 Nov 2026
PKR edges higher against USDMettis• 25 Nov 2026
PSX: volatility at bourse, KSE-100 sheds over 400 pointsBR• 25 Nov 2026
Oil edges down as supply glut prospect offsets Middle East disruption fearsBR• 25 Nov 2026
Rupee records gain against US dollarBR• 25 Nov 2026
ADB okays $250m loan to strengthen Pakistan’s public-private partnership systemDawn• 25 Nov 2026

