PPL gets nod for Adhi Field development, production lease
Mettis Global • • 1 min read
_20251124100208441_c47215.webp%3Fwidth%3D950%26height%3D450%26format%3DWebp&w=3840&q=75)
Mettis Global reported that Pakistan Petroleum Limited (PPL) has been cleared by regulators for a Development and Production Lease over the Adhi Field. The acreage spans 212.86 sq. kms across the Rawalpindi and Chakwal districts of Punjab province. PPL informed the exchange of the development through a notification.
The lease has been awarded to the Adhi Joint Venture, in which PPL serves as operator with a 39% working interest. Oil and Gas Development Company Limited (OGDCL) holds 50%, while Pakistan Oilfields Limited (POL) holds the remaining 11%. The grant runs for twelve years from November 13, 2024.
The approval falls under Rule 30-A of the Pakistan Onshore Petroleum (Exploration and Production) Rules, 2013, and applies on prescribed terms and conditions. The effective date therefore predates the disclosure to the exchange.
At a glance
- PPL is operator of the Adhi Joint Venture with a 39% working interest.
- OGDCL holds 50% and POL holds the remaining 11% working interest.
- The lease covers twelve years and takes effect from November 13, 2024.
Stocks in this story
Originally reported by Mettis Global
This page is Investify's own summary. The full report, with all details and context, is on the publisher's site.
Read the full storyWant the full article here?
Log in to read the full article in the Investify reader, in English or Urdu.
Investify summarizes Pakistan Stock Exchange news in its own words and links each story to its original publisher. We always credit the source so you can read the full report and verify the details before making financial decisions.
More on PPL
SOEs scrap LPG auctions after LHC interventionTribune• 21 Nov 2026Neutral coverage
PPL plans $40mn deep drilling at Sui: reportBR• 11 Nov 2026Positive coverage
PPL 1QFY27 profit tops Rs25bnMettis• 29 Oct 2026Positive coverage
Pakistan Petroleum Ltd earns Rs99bn profit, makes 11 discoveriesDawn• 28 Oct 2026Positive coverage
Pakistan Petroleum’s headquarters relocation to Islamabad faces PPP opposition; govt denies political motivesProfit• 21 Oct 2026Negative coverage
SECP lifts lending restrictions on RCDP, orders corrective measuresProfit• 24 Nov 2026

