Neelum-Jhelum hydropower project to remain shut until March 2028
Profit by Pakistan Today • • 1 min read

Profit reported, citing The News, that Pakistan's 969-megawatt Neelum-Jhelum Hydropower Project will stay offline until at least March 2028, stretching the shutdown to nearly four years. Wapda Chairman Lt-Gen (retd) Muhammad Saeed told the Senate Standing Committee on Water Resources that repairs are in progress after a rock burst damaged the underground tunnel system.
The plant has been offline since May 2024, leaving the national grid more dependent on costly thermal generation even though consumers keep paying the NJ surcharge through their bills. Muhammad Saeed said pre-construction geological studies had classed the area as seismic, while probes into the tunnel failure remain ongoing. Lawmakers have demanded a transparent inquiry into whether geology alone caused the damage or whether design, construction or operational shortcomings were involved.
Lawmakers also raised concerns about water insecurity, and members noted that Pakistan has not built a major dam since Tarbela and Mangla, compared with roughly 5,000 dams in India. The committee heard that a Dam Safety Council Bill, drafted with Asian Development Bank support, is now finalised. Wapda's briefing also covered the Nai Gaj Dam, which remains stuck in litigation after a contractor allegedly provided a fake bank guarantee, leading to losses of roughly Rs23 billion.
At a glance
- The 969-megawatt Neelum-Jhelum plant will stay offline until at least March 2028.
- The plant has been offline since May 2024, forcing greater reliance on thermal power.
- Lawmakers demanded a transparent inquiry into whether geology or design caused the tunnel damage.
Originally reported by Profit by Pakistan Today
This page is Investify's own summary. The full report, with all details and context, is on the publisher's site.
Read the full storyWant the full article here?
Log in to read the full article in the Investify reader, in English or Urdu.
Investify summarizes Pakistan Stock Exchange news in its own words and links each story to its original publisher. We always credit the source so you can read the full report and verify the details before making financial decisions.
More PSX market news
Maldives plans direct flights to Pakistan as bilateral cooperation expandsProfit• 25 Nov 2026
Pakistan invites Maldives to invest in tuna-processing industryProfit• 25 Nov 2026
India-UK investment treaty talks stall, pact unlikely soon, officials sayBR• 25 Nov 2026
Govt raises Rs291bn in Hybrid Sukuk auctionMettis• 25 Nov 2026
India's RBI sees broad food inflation pressures; was net dollar buyer in Sept, bulletin showsBR• 25 Nov 2026
SBP raises Rs690bn through MTB auctionMettis• 25 Nov 2026

