HUBCO eyes 300,000-tonne aluminum smelter project
Mettis Global • • 1 min read

Hub Power Company Limited (HUBCO) said on November 16 that its wholly owned subsidiary, Hub Power Holdings Limited, had hired a Chinese design institute to prepare a bankable feasibility study for a proposed aluminum smelter. The facility is being considered with annual output capacity of 300,000 tonnes, according to Mettis Global.
The assessment will examine whether the project is technically workable and commercially and financially viable. Its results are intended to guide later decisions on development and funding, but construction is not confirmed. HUBCO said progress depends on the study’s conclusions, required company and regulatory clearances, and financing arrangements.
The proposal forms part of HUBCO’s stated effort to broaden its business and pursue sustainable growth, while contributing to Pakistan’s industrialisation. For investors, the announcement is an early-stage diversification initiative rather than a final commitment to build the smelter.
At a glance
- HUBCO’s subsidiary commissioned a feasibility study for a proposed aluminum smelter.
- The planned facility is designed for annual capacity of 300,000 tonnes.
- Development depends on study results, approvals and financing.
Stocks in this story
Originally reported by Mettis Global
This page is Investify's own summary. The full report, with all details and context, is on the publisher's site.
Read the full storyWant the full article here?
Log in to read the full article in the Investify reader, in English or Urdu.
Investify summarizes Pakistan Stock Exchange news in its own words and links each story to its original publisher. We always credit the source so you can read the full report and verify the details before making financial decisions.
More on HUBC
HUBCO to begin local BYD vehicle production in December, starting with Sealion 6Profit• 3 Nov 2026Positive coverage
HUBCO to commence local BYD vehicle production next month: reportBR• 3 Nov 2026Positive coverage
HUBC powers ahead as profits climbBR• 29 Oct 2026Positive coverage
HUBC 1QFY27 profit climbs 10%Mettis• 28 Oct 2026Positive coverage
HUBCO’s 660MW coal power unit in Balochistan goes offline after major transformer faultProfit• 22 Oct 2026Negative coverage
HUBC’s CPHGC Unit 1 offline after main transformer faultMettis• 21 Oct 2026Negative coverage

