Pakistan Atomic Energy Commission signs contract for hydropower plant at outfall of Chashma-5
Dawn • • 1 min read

Dawn reported that the PAEC Foundation has signed a contract for its fifth hydropower station, FHPP-05, a 5MW project to be built at the discharge point of the Chashma-5 nuclear plant. The PAEC statement said the plant should generate about 30.66 million kilowatt-hours of electricity a year for the national grid once operational. Generation is slated to begin by September 2029, with the work awarded to a joint venture of three firms.
The scheme will tap the existing hydro capacity at the location, which should improve water resource use and support sustainable output. The agreement was concluded at PAEC Headquarters with a joint venture formed by China Ocean Engineering Construction Corporation Ltd., Ningbo Water Conservancy and Hydro Power Planning and Design Institute Co. Ltd., and Habib Rafique Engineering (Pvt.) Ltd.
The foundation's parent body is PAEC, and the foundation was set up in 1994 to serve staff and their families. Separately, PAEC's six nuclear plants currently supply 3,530MW to the grid, while the IAEA signed a safeguards deal with Pakistan earlier this month for the 1,200MW Chashma-5 facility.
At a glance
- PAEC Foundation signed a contract for FHPP-05, a 5MW hydropower plant.
- The plant is expected to generate about 30.66 million kilowatt-hours a year.
- Electricity generation is expected to begin by September 2029.
Originally reported by Dawn
This page is Investify's own summary. The full report, with all details and context, is on the publisher's site.
Read the full storyWant the full article here?
Log in to read the full article in the Investify reader, in English or Urdu.
Investify summarizes Pakistan Stock Exchange news in its own words and links each story to its original publisher. We always credit the source so you can read the full report and verify the details before making financial decisions.
More PSX market news
Step-by-step guide: How to amend or cancel FBR e-invoice after 72 hoursBR• 8 Nov 2026
Oil and gas companies highlight community welfare investments at PPEPCA conferenceProfit• 8 Nov 2026
Sindh governor seeks industry support to create jobs for Balochistan youthProfit• 8 Nov 2026
Power Division clarifies Rs25.30 per unit rate applies only to incremental electricity consumptionProfit• 8 Nov 2026
GTR Tyres to explore export opportunities at Automechanika Dubai 2026Profit• 8 Nov 2026
PM approves final draft of new auto policy, sends it for Cabinet considerationProfit• 8 Nov 2026

