CorporateQuick read

Pioneer Cement commissions 28 MW solar plant in Khushab, expands capacity to 31 MW

Profit by Pakistan Today • • 1 min read

Pioneer Cement commissions 28 MW solar plant in Khushab, expands capacity to 31 MW

Pioneer Cement has brought a 28.265 MW solar installation into service at its Chenki manufacturing site in Khushab, according to a November 3 notice to the Pakistan Stock Exchange, reported by Profit by Pakistan Today. The company has also revised the project’s planned size to 31 MW, with the remaining capacity expected to start operating within a month.

Once fully operational, the solar facility is expected to supply about 45% of Pioneer Cement’s annual electricity needs. The company says the shift will reduce power spending and support more efficient operations, with a positive contribution to profitability and sustainability among its stated objectives.

At a glance

  • Pioneer Cement commissioned a 28.265 MW solar facility at its Khushab plant.
  • The project’s planned capacity is now 31 MW, with the balance expected within a month.
  • Solar power is expected to cover about 45% of annual electricity requirements.

Stocks in this story

Sectors:Cement

Originally reported by Profit by Pakistan Today

This page is Investify's own summary. The full report, with all details and context, is on the publisher's site.

Read the full story

Want the full article here?

Log in to read the full article in the Investify reader, in English or Urdu.

Investify summarizes Pakistan Stock Exchange news in its own words and links each story to its original publisher. We always credit the source so you can read the full report and verify the details before making financial decisions.

Built for PSX investors

Business news.Every filing, summarised.

Top stories from Pakistan's business press and key findings from every PSX announcement.

Investify announcement summary with key findings from a PSX filing
Investify app home screen with Pakistan business news and PSX filings